How to install Chain sprocket
Before installation:
Transhipment tower and silo again after installation of Chain sprocket.
Note:
All of the belt conveyor installation and adjustment according to the geological parameters and drawings.
Installation:
crossed
Check construction, anchoring bolt and embedded steel
Check all parts of chain sprocket
According to the installation of Chain sprocket
Installing and adjusting equipment (including the upper roller wiper, etc), the driving device,
Installation tape hoist
Install expansion
Installation guide manger
Install tension device
Install all electrical part
Tape cut and vulcanization connection
Before the end of the installation work
Inspection: the chain sprocket before installation check whether and drawings and geological graphics.
Electrical parts:
Install cable ducts
Install limit switches and protective device, electric control cabinet, etc
Install lamps
Laying cables
Connecting wires
Painting:
Paint the damaged part and cleaning according to specification for spray paint.
Oil:
According to procedures stipulated by the operating manual lubricating oil or grease will add to the following equipment: add reducer, couplings, crane, housing, motor bearing etc.
